Those small movements often trace back to how the deck was fastened and how the ground under it reacts to the weather here. We look at the surface, the railings and the stairs together, because each one affects the others once the work starts.
What a failing deck looks like
We start by walking the surface and checking where the decking boards meet each joist. A board that lifts or a fastener that has backed out usually means the original nails or screws didn't stay tight through the wet and dry cycles. We re-secure or replace those boards with two ring-shank 8D nails or 2-1/2 inch wood screws (or the specified deck screws) at every joist, so the surface stays solid underfoot.
A railing that rocks when you push on it points to movement at the posts or the top rail connections. Stairs that no longer sit level usually show the shift at the stringers or at the base. We measure the rise and run on the stairs and note any gaps before deciding whether repair or full replacement makes sense for the rest of the deck.
These questions come up on composite deck builder jobs. Shopping for a deck builder in Marietta? Our home page has more.
Why the seasons are hard on decks
Temperature swings through the year make the wood expand and contract, and the occasional winter freeze adds some freeze/thaw movement in the ground. Together they work on every joint until connections that were tight start to loosen. We see it most where the deck meets the house and at the outer posts, so those are the first places we check on any repair.

Where moisture gets in
Wet and dry seasons move the soil, and that movement stresses whatever the posts sit on. We check each post for tilt or settlement at the base before we plan the repair, and a stair stringer that no longer lines up is often the first sign of it.
Once the surface is open we can see whether the joist hangers are still seated. If the ground has shifted, we re-seat them or add support before any decking goes back down.
Do you need a permit
When the work needs a permit, the fee runs $45 to $400. We schedule the framing inspection and the final inspection before we close out the job, so the work is signed off and you have the paperwork.
On a small board or fastener repair, we check whether that scope needs a permit at all. If the job grows into new stairs or railings, the same inspection steps apply.
What replacing stairs and railings involves
A set of stairs with four risers runs $625 to $1,150. We set stairs and railings only after the deck surface is finished, so they line up with the final board height and nobody has to rework finished pieces.
We can give you a typical range on the phone, then confirm the exact number once we've seen your stairs and the deck they tie into.
Related Services
Parts of the Job
In detail, these are part of it:
- Position the ledger board at the attachment point to the house and apply flashing.
- Place joists using spacing and spans that meet code, then secure with suitable hangers or connectors.
Pick up the phone and run it by us, and there's no pressure to book.
Updated October 2026